Emirates Stadium

A late kick-off meant this project required a fast track build programme to guarantee completion for the start of the 2006 season.

Patterns & Moulds supplied the bullet shaped GRP void formers to allow the in-situ casting of coffered slabs above the main concourse and restaurant areas of the grandstand as well as the elliptical columns in the directors’ boxes.

We CNC machined laminated MDF then coated the shutters in GRP to achieve the high quality surface required for these public and prestigious areas.

One full size timber master pattern allowed us to produce 2 GRP master moulds and then over 40 individually sized GRP formers.